Abstract :
Available transfer capability (ATC) calculation is a complicated task that involves the determination of total transfer capability (TTC) and two margins: transmission reliability margin (TRM) and capacity benefit margin (CBM). Three currently used methods of TTC determination are presented and compared in this paper. Besides these methods, the transfer-based security constrained OPF (TSCOPF) method is proposed in this paper as a replacement of the conventional SCOPF method for use in the deregulation environment. Both TRM and CBM, which account for reliability of the system, are seldom mentioned in papers associated with ATC. This paper presents a probabilistic method to assess TRM and proposes rules and a procedure to allocate CBM and two methods of incorporating CBM into ATC. A modified IEEE RTS is utilized to demonstrate the proposed methods, and the results show that the values of ATC are quite different when margins are taken into account and the methods of incorporating ATC affect the ATC value significantly.
Keywords :
Costs; Power system faults; Power system modeling; Power system relaying; Power system reliability; Power system simulation; Power transmission lines; Protective relaying; Transformers; Transmission line measurements; Available transfer capability; capability benefit margin; total transfer capability; transmission reliability margin;
fLanguage :
English
Journal_Title :
Power Engineering Review, IEEE
Publisher :
ieee
ISSN :
0272-1724
Type :
jour
DOI :
10.1109/MPER.2002.4312218
Filename :
4312218
Link To Document :
بازگشت