• DocumentCode
    1268601
  • Title

    French electrification progress

  • Volume
    44
  • Issue
    2
  • fYear
    1925
  • Firstpage
    178
  • Lastpage
    178
  • Abstract
    Among the achievements in the field of production and distribution of electric current in 1923 are the completion of a part of the installations at 150,000 volts of the railroads of the Midi, the commencement of the construction of the great feeder at 150,000 volts of the Orleans Railway, the substantial enlargements of the generating stations serving the region of Paris, the putting into service of the State system at 45,000 volts in the north of France, the completion of new sections of the Paris subterranean lines at 60,000 volts, and the beginning of construction of several lines at 120,000 volts, notably those which will transmit to Lyons the energy produced by the Viclaire plant in the Alps.
  • fLanguage
    English
  • Journal_Title
    A.I.E.E., Journal of the
  • Publisher
    ieee
  • ISSN
    0095-9804
  • Type

    jour

  • DOI
    10.1109/JAIEE.1925.6536173
  • Filename
    6536173