DocumentCode
1269657
Title
Dropping a dam into place
Volume
49
Issue
10
fYear
1930
Firstpage
854
Lastpage
854
Abstract
The Alcoa Power Company, Limited has under construction a large hydroelectric power development at Chute-a-Caron on the Saguenay River which has a flow varying from 35,000 to 225,000 cu. ft. per sec. The site selected was a gorge located in a rocky section of the river. To complete the large masonry dam across this gorge it was necessary to divert the river, at low flow, through a new channel.
fLanguage
English
Journal_Title
A.I.E.E., Journal of the
Publisher
ieee
ISSN
0095-9804
Type
jour
DOI
10.1109/JAIEE.1930.6536355
Filename
6536355
Link To Document