DocumentCode :
1277847
Title :
High fuel costs compel hydroelectric development
Volume :
43
Issue :
11
fYear :
1924
Firstpage :
1033
Lastpage :
1033
Abstract :
Electrical engineers in Germany are being forced by the high price of coal to utilize the nation´s waterpower resources to the fullest extent. The first hydroelectric plant in the Province of Brandenburg, located at Spremberg, started operating this year. The satisfactory results obtained have led to a survey of other possible power sites in this province and favorable places have been discovered at Wendisch-Buchholt, at Boden near Deichow, and at Lausitzer Neisse near Forst. The intentions are that work will be started on these plants as soon as economic conditions in Germany permit.
fLanguage :
English
Journal_Title :
A.I.E.E., Journal of the
Publisher :
ieee
ISSN :
0095-9804
Type :
jour
DOI :
10.1109/JAIEE.1924.6537788
Filename :
6537788
Link To Document :
بازگشت