DocumentCode :
1281067
Title :
Present practise in the automatic operation of hydroelectric generating stations
Author :
Wensley, R.J.
Author_Institution :
Switchboard Engineering Department, Westinghouse Electric & Mfg. Co., East Pittsbugrh, Pa.
Volume :
43
Issue :
6
fYear :
1924
fDate :
6/1/1924 12:00:00 AM
Firstpage :
508
Lastpage :
513
Abstract :
Present practise in the design of automatic hydroelectric generating stations is reviewed. Various methods of starting and controlling are listed together with their limitations. Certain points in dispute, such as the W R2 required for speed regulation and brakes for bearing protection are presented in the hope that discussion will aid in clarifying the situation to such a degree as to permit of standardization of practise. A brief description of the sequence of operations in a modern automatic switching equipment, is given.
fLanguage :
English
Journal_Title :
A.I.E.E., Journal of the
Publisher :
ieee
ISSN :
0095-9804
Type :
jour
DOI :
10.1109/JAIEE.1924.6538341
Filename :
6538341
Link To Document :
بازگشت