DocumentCode
1290899
Title
Dinorwic - a progress report
Author
Holmes, Lewis
Volume
26
Issue
5
fYear
1980
fDate
5/1/1980 12:00:00 AM
Firstpage
362
Lastpage
364
Abstract
The construction of the pumped-storage power station at Dinorwic is moving into the phase of installing electrical plant. Full power capacity is to be built up in stages, with the first of the six generator/motor units to be commissioned late next year
fLanguage
English
Journal_Title
Electronics and Power
Publisher
iet
ISSN
0013-5127
Type
jour
DOI
10.1049/ep.1980.0208
Filename
5197636
Link To Document