• DocumentCode
    1290899
  • Title

    Dinorwic - a progress report

  • Author

    Holmes, Lewis

  • Volume
    26
  • Issue
    5
  • fYear
    1980
  • fDate
    5/1/1980 12:00:00 AM
  • Firstpage
    362
  • Lastpage
    364
  • Abstract
    The construction of the pumped-storage power station at Dinorwic is moving into the phase of installing electrical plant. Full power capacity is to be built up in stages, with the first of the six generator/motor units to be commissioned late next year
  • fLanguage
    English
  • Journal_Title
    Electronics and Power
  • Publisher
    iet
  • ISSN
    0013-5127
  • Type

    jour

  • DOI
    10.1049/ep.1980.0208
  • Filename
    5197636