This paper treats a particular type of Markov system: time nonhomogeneous Markov system in discrete time. In order to adapt measures to this kind of system, performability measures are formulated, such as new indicators more dedicated to electrical power systems like `instantaneous mean load curtailed´ and `mean energy not supplied on a time interval´. This method considers hazard-rate time variation in order to: 1) obtain more-accurate and more-instructive indicators; and 2) access new performability indicators that cannot be obtained by classical methods. An example from an Electricite De France electrical substation illustrates this
Keywords
Markov processes; failure analysis; power system reliability; probability; substations; Electricite De France; discrete time nonhomogeneous Markov chains; electric power system performability; electrical substation; hazard-rate time variation; instantaneous mean load curtailed; mean energy not supplied on a time interval; performability indicators; Availability; Electric variables measurement; Energy measurement; Performance evaluation; Power system measurements; Power system modeling; Power system restoration; Substations; Time measurement; Time varying systems;
fLanguage
English
Journal_Title
Reliability, IEEE Transactions on
Publisher
ieee
ISSN
0018-9529
Type
jour
DOI
10.1109/24.556582
Filename
556582
Link To Document