DocumentCode :
1347407
Title :
Rapid transit progress in Toronto
Author :
Inglis, J. G.
Author_Institution :
Toronto Transit Commission, Toronto, Ont., Canada
Volume :
75
Issue :
6
fYear :
1957
Firstpage :
352
Lastpage :
354
Abstract :
CANADA´S first subway began operating in Toronto on March 30, 1954. In the first 2 years of operation it has carried about 144,000,000 passengers and its cars have travelled about 12,000,000 miles. So successful has it been that the initial order of 106 cars is being increased over 30% (per cent) by an order for 34 more. Their arrival during the coming summer will permit the system to operate at its ultimate designed capacity of 40,000 passengers per hour in each direction. Its popularity with the riding public has created an urgent demand for a second subway and has proved the advantages of rapid transit in one more metropolitan area.
Keywords :
Cities and towns; Color; Furnaces; Lighting; Transportation; Voltage fluctuations; Voltage measurement;
fLanguage :
English
Journal_Title :
American Institute of Electrical Engineers, Part II: Applications and Industry, Transactions of the
Publisher :
ieee
ISSN :
0097-2185
Type :
jour
DOI :
10.1109/TAI.1957.6367258
Filename :
6367258
Link To Document :
بازگشت