Power/energy: Hybrid load shedding is frequency based: Time at a given frequency is also important, bringing stabilization in a matter of seconds even when as much as two thirds of the load must be shed
Author :
Hicks, K.L.
Volume :
20
Issue :
2
fYear :
1983
Firstpage :
52
Lastpage :
56
Abstract :
When an electric system imports large amounts of power from outside its area, it needs a new approach to load shedding. Even the best conventional frequency-coordinated shedding may not prevent a blackout when external power is lost and more than 50 percent of the load must be shed. However, a hybrid load-shedding scheme that includes at least one time-coordinated step in addition to several frequency-coordinated steps can readily shed 70 percent and more of the load. Such a concept has been adopted by the Florida Power & Light Co., the Sierra Pacific Power Co. in Nevada, and the Electric Service Commission (Escom) of the Republic of South Africa. The choice of frequency settings of load-shedding relays, load-shed increments, and time delays is critical; it depends on the circumstances at a given utility. The coordination is aided greatly by a computer program, LOAD SHED, developed expressly for this purpose. Hybrid shedding techniques and the LOADSHED program are reviewed.
Keywords :
load shedding; power system computer control; frequency-coordinated steps; hybrid load-shedding scheme; time-coordinated step; Computers; Generators; Load modeling; Relays; Time frequency analysis; Turbines; Valves;
fLanguage :
English
Journal_Title :
Spectrum, IEEE
Publisher :
ieee
ISSN :
0018-9235
Type :
jour
DOI :
10.1109/MSPEC.1983.6369005
Filename :
6369005
Link To Document :
بازگشت