    A framework for the prioritization of underground transmission cable renewal projects in power electric utility companies

  • Author

    Wong, Kai-Kit

  • fYear
    2014
  • fDate
    27-31 July 2014
  • Firstpage
    1
  • Lastpage
    1
  • Abstract
    Summary form only given. This paper reviews the current asset management methodologies in power electric utility companies and identifies the present challenges and problems encountered by utility companies with the current methodologies in managing and prioritizing underground transmission cable asset renewal projects. This paper proposes as an addition to the current methodologies, a more systematic framework for evaluating and ranking underground transmission cable asset renewal investment projects based on the modeling of uncertainties and on determining the relative importance of a particular transmission line circuit in the power system as it affects the bulk power system reliability.
  • Keywords
    investment; power cables; power transmission economics; power transmission reliability; underground transmission systems; asset management methodologies; bulk power system reliability; power electric utility companies; transmission line circuit; underground transmission cable asset renewal investment projects; Asset management; Companies; Integrated circuit modeling; Investment; Power cables; Power industry; Systematics;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    PES General Meeting | Conference & Exposition, 2014 IEEE
  • Conference_Location
    National Harbor, MD
  • Type

    conf

  • DOI
    10.1109/PESGM.2014.6939872
  • Filename
    6939872