Soccer Field Strategy
Author
Mah, E.J. ; Stangl, J.
Volume
8
Issue
6
fYear
2010
Firstpage
69
Lastpage
74
Abstract
The long-term performance of BC hydro´s distribution network depends on the effectiveness of maintenance and capital replacement plans. These plans must not only identify short-term system requirements but also target expenditures to proactively address future performance issues in a cost-effective manner. This article describes the processes and tools used by BC Hydro Distribution Asset Strategy and Planning (DASP) to plan for the maintenance and replacement of existing assets. These processes focus on the development of long-term plans for maintaining safety and reliability, based on the ongoing maintenance requirements of distribution equipment as well as the anticipated end-of-life for BC Hydro´s aging asset base.
Keywords
hydroelectric power stations; maintenance engineering; power distribution planning; BC hydro distribution asset maintenance; BC hydro distribution asset strategy and planning; BC hydro distribution network; DASP; capital replacement planning process; soccer field strategy; Asset management; Electricity supply industry; Hydroelectric power generation; Power distribution lines; Power system economics; Power system planning; Power system reliability;
fLanguage
English
Journal_Title
Power and Energy Magazine, IEEE
Publisher
ieee
ISSN
1540-7977
Type
jour
DOI
10.1109/MPE.2010.938517
Filename
5618499
Link To Document