• DocumentCode
    1375005
  • Title

    A Novel Load Transfer Scheme for Peak Load Management in Rural Areas

  • Author

    Wishart, Michael T. ; Turner, Jon ; Perera, Lasantha B. ; Ghosh, Arindam ; Ledwich, Gerard

  • Author_Institution
    Sch. of Eng. Syst., Queensland Univ. of Technol., Brisbane, QLD, Australia
  • Volume
    26
  • Issue
    2
  • fYear
    2011
  • fDate
    4/1/2011 12:00:00 AM
  • Firstpage
    1203
  • Lastpage
    1211
  • Abstract
    This paper proposes a novel peak load management scheme for rural areas. The scheme transfers certain customers onto local nonembedded generators during peak load periods to alleviate network under voltage problems. This paper develops and presents this system by way of a case study in Central Queensland, Australia. A methodology is presented for determining the best location for the nonembedded generators as well as the number of generators required to alleviate network problems. A control algorithm to transfer and reconnect customers is developed to ensure that the network voltage profile remains within specification under all plausible load conditions. Finally, simulations are presented to show the performance of the system over a typical maximum daily load profile with large stochastic load variations.
  • Keywords
    load management; power generation control; power generation planning; Australia; Central Queensland; load transfer scheme; local nonembedded generators; network voltage profile; peak load management; rural areas; Nonembedded generation; peak load management; peak load shaving; rural distribution planning; single-wire earth return (SWER);
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/TPWRD.2010.2082573
  • Filename
    5629390