Title :
Some engineering features of the Southern Power company´s system
fDate :
6/1/1908 12:00:00 AM
Abstract :
It has been aptly stated that in order to build a hydroelectric power system there are three fundamental requirements: 1. A sufficient source of power. 2. A market for the sale of power within economical transmitting distance. 3. The necessary capital.
Keywords :
Cities and towns; Concrete; Cotton; Generators; Induction motors; Power systems; Rivers;
Journal_Title :
American Institute of Electrical Engineers, Proceedings of the
DOI :
10.1109/PAIEE.1908.6742497