DocumentCode :
1376861
Title :
Some engineering features of the Southern Power company´s system
Author :
Fraser, J.W.
Volume :
27
Issue :
6
fYear :
1908
fDate :
6/1/1908 12:00:00 AM
Firstpage :
1085
Lastpage :
1106
Abstract :
It has been aptly stated that in order to build a hydroelectric power system there are three fundamental requirements: 1. A sufficient source of power. 2. A market for the sale of power within economical transmitting distance. 3. The necessary capital.
Keywords :
Cities and towns; Concrete; Cotton; Generators; Induction motors; Power systems; Rivers;
fLanguage :
English
Journal_Title :
American Institute of Electrical Engineers, Proceedings of the
Publisher :
ieee
ISSN :
0097-2444
Type :
jour
DOI :
10.1109/PAIEE.1908.6742497
Filename :
6742497
Link To Document :
بازگشت