DocumentCode
1389385
Title
An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-Simulation Algorithms
Author
Kacar, Necip Baris ; Irdem, Durmus Fatih ; Uzsoy, Reha
Author_Institution
Edward P. Fitts Dept. of Ind. & Syst. Eng., North Carolina State Univ., Raleigh, NC, USA
Volume
25
Issue
1
fYear
2012
Firstpage
104
Lastpage
117
Abstract
We compare the performance of three algorithms for production planning with workload-dependent lead times. These include a clearing function model using two different methods for estimating the clearing functions, and two iterative algorithms that combine linear programming and simulation models. Our experimental comparison uses a simulation model of a re-entrant bottleneck system built with attributes of a real-world semiconductor fabrication environment. We vary the bottleneck utilization, demand patterns, the mean time to failure, and the mean time to repair. Results indicate that the clearing function model performs better than the iterative algorithms on the scaled-down system considered, giving less variable production plans and higher profit values.
Keywords
iterative methods; linear programming; production planning; semiconductor device manufacture; clearing function model; iterative linear programming simulation algorithms; production planning; real-world semiconductor fabrication environment; reentrant bottleneck system; workload dependent lead times; Computational modeling; Mathematical model; Planning; Production planning; Semiconductor device modeling; Clearing function; linear programming (LP); production planning; simulation; workload-dependent lead times;
fLanguage
English
Journal_Title
Semiconductor Manufacturing, IEEE Transactions on
Publisher
ieee
ISSN
0894-6507
Type
jour
DOI
10.1109/TSM.2011.2176560
Filename
6095380
Link To Document