DocumentCode :
1395753
Title :
Power system stability assessment during restoration based on a wide area measurement system
Author :
Nourizadeh, Saber ; Karimi, M.J. ; Ranjbar, A.M. ; Shirani, A.
Author_Institution :
Dept. of Electr. Eng., Sharif Univ. of Technol., Tehran, Iran
Volume :
6
Issue :
11
fYear :
2012
fDate :
11/1/2012 12:00:00 AM
Firstpage :
1171
Lastpage :
1179
Abstract :
Online power system stability assessment during restoration has not been strongly addressed yet. The introduction of wide area measurement systems (WAMS), however, made it possible to monitor the stability online. This study technically presents a detailed analysis of stability during restoration using WAMS. The power system build-up strategy is used as the restoration approach, based on which the early and the last stages of restoration are to divide the power system into islands and interconnect them, respectively. In fact, the practical use of WAMS at the early stages of restoration provides precise determination of generators loading steps. Moreover, unification of phase angle references at different islands and presentation of tie line energising priority list are significant benefits of WAMS at the last stages of restoration. The New England 39-bus power system is used to demonstrate the proposed algorithm and verify the results. The proposed method is also applied on the IEEE 118-bus system as a large-scale power system to prove its capability in practical systems.
Keywords :
power system measurement; power system restoration; power system stability; IEEE 118-bus system; New England 39-bus power system; large-scale power system; loading steps; online power system stability assessment; phase angle references; power system build-up strategy; restoration approach; tie line energising priority list; wide area measurement system;
fLanguage :
English
Journal_Title :
Generation, Transmission & Distribution, IET
Publisher :
iet
ISSN :
1751-8687
Type :
jour
DOI :
10.1049/iet-gtd.2012.0054
Filename :
6407176
Link To Document :
بازگشت