DocumentCode :
1408031
Title :
Philadelphia electric company´s system
Author :
Anderson, Jonathan W. ; Estrada, Herbert
Author_Institution :
Philadelphia Electric Company, Philadelphia, Pa.
Volume :
51
Issue :
6
fYear :
1932
fDate :
6/1/1932 12:00:00 AM
Firstpage :
405
Lastpage :
406
Abstract :
Maximum system economy is attained when the sum of operating costs plus fixed charges on investment is a minimum. Considerations of reliability usually lead to increased capital investment for sturdier facilities and for spare equipment, and consequently add to the fixed charge burden. Fortunately, however, operating costs are to some extent inversely proportional to fixed charges, and analyses of system performance often will reveal operating savings which can result from judicious use of investment in spare facilities.
Keywords :
Aluminum; Companies; Educational institutions; Films; Inductance; Investments; Reliability;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1932.6429837
Filename :
6429837
Link To Document :
بازگشت