DocumentCode
1414577
Title
Field testing of bushings and transformer insulation by the power-factor method
Author
Gross, I. W.
Author_Institution
American Gas and Electric Service Corporation, New York, N. Y.
Volume
57
Issue
10
fYear
1938
Firstpage
589
Lastpage
600
Abstract
THE IMPORTANCE of maintaining the insulation on all parts of an electric system in good operating condition is fundamental with any power company today, particularly on such equipment as high- and medium-voltage bushings and transformers. The maintenance of such insulation requires some sort of periodic test to determine its condition, an exact location of faults, and requirements for reconditioning or replacing faulty parts.
Keywords
Circuit faults; Insulators; Oil insulation; Power transformer insulation; Testing; Windings;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1938.6430966
Filename
6430966
Link To Document