DocumentCode :
1421589
Title :
Power arc-over on overhead distribution lines and newly developed equipment for protection against conductor burndown from that cause
Author :
Matthews, G. A.
Author_Institution :
Electrical system, The Detroit Edison Company, Detroit, Mich.
Volume :
60
Issue :
6
fYear :
1941
fDate :
6/1/1941 12:00:00 AM
Firstpage :
596
Lastpage :
604
Abstract :
With conventional types of switchgear and customary methods of circuit operation, power arc-overs resulting from transient faults on overhead primary lines cause unnecessary burndown of conductors and undesired operation of fuses. The majority of faults on overhead distribution circuits are of transient nature.
Keywords :
Circuit faults; Conductors; Copper; Fault currents; Fuses; Transient analysis; Wires;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1941.6432200
Filename :
6432200
Link To Document :
بازگشت