DocumentCode :
1431722
Title :
Central control at Sewaren generating station
Author :
Fairchild, F. P.
Author_Institution :
Electrical Engineering Department, Public Service Electric and Gas Company, Newark, N. J.
Volume :
69
Issue :
6
fYear :
1950
fDate :
6/1/1950 12:00:00 AM
Firstpage :
491
Lastpage :
492
Abstract :
WHEN the present work on the Sewaren Generating Station of the Public Service and Gas Company in New Jersey is finished in 1951, the plant will be a 455,000-kw station embodying unit design with central control of the four units in pairs. The first two units started operating in December 1948. Throttle steam conditions are 1,500 pounds per square inch gauge and 1,050 degrees Fahrenheit. The station is arranged to burn coal, fuel oil, or natural gas. All auxiliaries are motor-driven.
Keywords :
Boilers; Companies; Generators; Instruments; Laboratories; Mathematics; Turbines;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1950.6433898
Filename :
6433898
Link To Document :
بازگشت