DocumentCode
1448334
Title
Systematization of tube surveillance in large scale computers
Author
Spence, H. W.
Author_Institution
Ballistic Research Laboratories, Aberdeen Proving Ground Md.
Volume
70
Issue
7
fYear
1951
fDate
7/1/1951 12:00:00 AM
Firstpage
605
Lastpage
608
Abstract
Ninety per cent of the service interruptions of ENIAC at Aberdeen Proving Ground are caused by vacuum-tube failures. A 5-month tube surveillance program was conducted wherein faulty tubes were detected and replaced. How such tubes were tested and their histories gathered is described together with the preliminary findings.
Keywords
Computers; Current measurement; Electron tubes; Resistance heating; Standards; Surveillance; Voltage measurement;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1951.6436708
Filename
6436708
Link To Document