Abstract
BUILDING A 330-kv transmission system meant going beyond the existing frontiers and establishing equipment and design principles on an entirely new basis. To go about this job, all available information was gathered together and to supplement this information the tests at the Tidd Plant of The Ohio Power Company were initiated and carried out over a long period of years so that there would be as few questions unsettled as possible when the actual work came to be done.
Keywords
Economics; Lightning protection; Oil insulation; Power transformer insulation; Transportation; Voltage transformers;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1954.6439194
Filename
6439194
Link To Document