DocumentCode
1469723
Title
First-Year Performance of a 20-MW
PV Power Plant
Author
Panchula, A. F. ; Hayes, W. ; Kimber, A.
Author_Institution
First Solar , Oakland, USA
Volume
2
Issue
3
fYear
2012
fDate
7/1/2012 12:00:00 AM
Firstpage
359
Lastpage
363
Abstract
After one year of continuous operation in Ontario, Canada, the measured performance of the Sarnia 20-MW
power plant can be compared with both the long-term energy prediction and the expected energy for the operating year 2010. Based on the first-year\´s data at Enbridge\´s Sarnia 20-MW
power plant, the power plant is operating 2.1% above the long-term prediction, which is well within the expected error bars of the measurements. Estimation of the modeling error not only shows that there is no single driver of the overall modeling error during normal operation but shows that improvements are possible as well.
Keywords
Performance evaluation; Photovoltaic systems; Power engineering and energy; Power generation; Solar power generation; Photovoltaic systems; power engineering and energy; power generation; solar power generation;
fLanguage
English
Journal_Title
Photovoltaics, IEEE Journal of
Publisher
ieee
ISSN
2156-3381
Type
jour
DOI
10.1109/JPHOTOV.2012.2185783
Filename
6169942
Link To Document