Title :
Overcurrent study on a rural system
Author :
Lincks, G. F. ; Edge, D. R. ; Mckinley, W. C. ; Leh, J. H.
Author_Institution :
General Electric Company, Pittsfield, Mass.
Abstract :
GOOD service continuity with the least possible outlay is a major problem on every rural distribution system. Sectionalizing the primary line is accepted practice today to improve continuity. The problem is to formulate numerically the benefits obtainable with different types of equipment and to find better protective methods.
Keywords :
Circuit faults; Companies; Current measurement; Electrical resistance measurement; Frequency measurement; Fuses; Lightning;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1949.6443280