DocumentCode
1571689
Title
Scheduling for continuous production processes with order priority considered
Author
Shuang, Bing ; Gu, Xingsheng
Author_Institution
Res. Inst. of Autom., East China Univ. of Sci. & Technol., Shanghai, China
Volume
4
fYear
2004
Firstpage
3114
Abstract
Order oriented production has been paid more and more attention in modern industry. The significance of different customers is different to an enterprise, to the priority of order increases with the significance of enterprise, and to the order with high priority that must be satisfied first. In order to ensure the due-date of order with priority, a vector is used to describe the priority of orders, continuous time is discretized and the productivity of equipment is divided also, and then an for continuous industrial process with order priority and due-date time-window is proposed. A genetic algorithm has been adopted in this schedule problem in which the productivity of equipment at each interval is coded with real number, the simulations demonstrate the efficiency of the proposed model.
Keywords
genetic algorithms; order processing; scheduling; continuous production processes scheduling; due-date time-window; genetic algorithm; order-oriented scheduling model; Continuous production; Genetic algorithms; Job shop scheduling; Productivity;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Control and Automation, 2004. WCICA 2004. Fifth World Congress on
Print_ISBN
0-7803-8273-0
Type
conf
DOI
10.1109/WCICA.2004.1343094
Filename
1343094
Link To Document