Title :
Short-term generation scheduling with reliability constraint using ant colony optimization algorithm
Author :
Shi, Libao ; Hao, Jin ; Zhou, Jiaqi ; Xu, Cuoyu
Author_Institution :
Dept. of Electr. Eng., Shanghai Jiao Tong Univ., China
Abstract :
The ant colony optimization algorithm is applied to the solution of optimal unit commitment (UC) with probabilistic spinning reserve determination. In general, the purpose of UC is to enhance the economical efficiency as could as possible while simultaneously satisfying physical and operation constraints of individual unit. Consider the possibility of generating unit failure, the requirement, the sufficient spinning reserve capacity to ensure adequate reliability levels, must be satisfied by the commitment schedule. The security function approach is applied to evaluate the desired level of system security, and the ACO approach is adopted to solve the UC problems. The effectiveness of the ACO method has been demonstrated on the corresponding numerical results. Further, the sensitivity of the desired security level to the optima during optimization is investigated in this paper.
Keywords :
cooperative systems; optimisation; power engineering computing; power generation economics; power generation scheduling; power system security; ant colony optimization algorithm; economical efficiency; optimal unit commitment; reliability constraint; short-term generation scheduling; system security; Ant colony optimization; Dynamic programming; Economic forecasting; Large-scale systems; Optimal scheduling; Power system dynamics; Power system security; Production systems; Scheduling algorithm; Spinning;
Conference_Titel :
Intelligent Control and Automation, 2004. WCICA 2004. Fifth World Congress on
Print_ISBN :
0-7803-8273-0
DOI :
10.1109/WCICA.2004.1343691