DocumentCode
1589340
Title
Planning and scheduling in a flexible manufacturing system using a dynamic routing method for automated guided vehicles
Author
Liu, Pci-Sen ; Fu, Li-Chen
Author_Institution
Dept. of Comput. & Inf. Eng., Nat. Taiwan Univ., Taipei, Taiwan
fYear
1989
Firstpage
1584
Abstract
An approach that can dynamically solve the planning and scheduling problem in a flexible manufacturing system (FMS) is presented. This problem is formulated as the determination of an optimal routing assignment of p automated guided vehicles among m workstations in order to accomplish N tasks in an FMS. A useful task representation called workgraph is introduced to facilitate the latter computation; then the A* search algorithm, the minimax criterion, and source heuristic rules are used to solve this routing assignment problem dynamically. The approach obtains a near-optimal solution in moderate computation time, and, in addition, solves some dynamic situations so as to make the FMS more flexible
Keywords
automatic guided vehicles; computerised materials handling; directed graphs; flexible manufacturing systems; heuristic programming; minimax techniques; scheduling; search problems; A* search algorithm; AGV; FMS; automated guided vehicles; dynamic routing method; minimax criterion; optimal routing assignment; planning; scheduling; source heuristic rules; workgraph; Automatic control; Dynamic scheduling; Flexible manufacturing systems; Job shop scheduling; Processor scheduling; Productivity; Routing; Vehicle dynamics; Vehicles; Workstations;
fLanguage
English
Publisher
ieee
Conference_Titel
Robotics and Automation, 1989. Proceedings., 1989 IEEE International Conference on
Conference_Location
Scottsdale, AZ
Print_ISBN
0-8186-1938-4
Type
conf
DOI
10.1109/ROBOT.1989.100204
Filename
100204
Link To Document