DocumentCode :
1632936
Title :
New development in distribution network pricing for revenue recovery in the Great Britain
Author :
Gu, Chenghong ; Li, Furong
fYear :
2011
Firstpage :
1
Lastpage :
5
Abstract :
This paper presents the latest development in (Extra-high Voltage) EHV network pricing in the UK. It introduces the amendment made to Long-run Incremental Cost (LRIC) pricing and Forward Cost Pricing (FCP) as suggested to overcome their particular disadvantages appearing in practice. Particularly, this paper investigates three scaling approaches examined and considered by Distribution Network Operators (DNOs) for revenue reconciliation. A small system is utilized to demonstrate the calculation of the three approaches and the final unrecovered revenue.
Keywords :
power distribution economics; pricing; DNO; EHV network pricing; FCP; Great Britain; LRIC pricing; distribution network operators; distribution network pricing; forward cost pricing; long-run incremental cost pricing; revenue reconciliation; revenue recovery; Adders; Biological system modeling; Economics; Educational institutions; Generators; Industries; Pricing; Distribution network charges; Forward cost pricing; Long-run incremental cost pricing; Revenue reconciliation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Society General Meeting, 2011 IEEE
Conference_Location :
San Diego, CA
ISSN :
1944-9925
Print_ISBN :
978-1-4577-1000-1
Electronic_ISBN :
1944-9925
Type :
conf
DOI :
10.1109/PES.2011.6039659
Filename :
6039659
Link To Document :
بازگشت