DocumentCode :
1637743
Title :
Tardiness in Fuzzy Flow Shop Scheduling Problems Based on Possibility and Necessity Measures
Author :
Lai, Peng-Jen ; Shu, Ming-Hung
Author_Institution :
Dept. of Math., Nat. Kaohsiung Normal Univ., Kaohsiung
Volume :
3
fYear :
2008
Firstpage :
437
Lastpage :
441
Abstract :
The scheduling problem with fuzzy processing times and fuzzy due dates are concerned in this paper. The concept of tardiness is much more flexibly interpreted based on the concepts of possibility and necessity measures in the fuzzy sets theory. Certain types of the objective function are taken into account through the different combinations of possibility and necessity measures. We turn these objective functions into fuzzy-valued functions. To obtain an optimal schedule which minimizes these fuzzy-valued objective functions, the ant colony algorithm is invoked to solve the optimal problem. One numerical example is also provided to clarify the discussion by using the commercial software Matlab.
Keywords :
flow shop scheduling; fuzzy set theory; optimisation; ant colony algorithm; fuzzy due date; fuzzy flow shop scheduling; fuzzy processing times; fuzzy set theory; fuzzy-valued objective function; necessity measure; optimal schedule; possibility measure; tardiness; Fluid flow measurement; Fuzzy set theory; Fuzzy sets; Fuzzy systems; Intelligent systems; Job shop scheduling; Mathematics; Optimal scheduling; Scheduling algorithm; Simulated annealing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Systems Design and Applications, 2008. ISDA '08. Eighth International Conference on
Conference_Location :
Kaohsiung
Print_ISBN :
978-0-7695-3382-7
Type :
conf
DOI :
10.1109/ISDA.2008.218
Filename :
4696505
Link To Document :
بازگشت