DocumentCode
164343
Title
Limit equation for mitigation of the temporary over voltage issue following the Network Control System Protection Scheme action
Author
Tien Ho ; Negnevitsky, Michael
Author_Institution
TasNetworks Pty. Ltd., Moonah, TAS, Australia
fYear
2014
fDate
Sept. 28 2014-Oct. 1 2014
Firstpage
1
Lastpage
5
Abstract
TasNetworks own and operate the Network Control System Protection Scheme and provide this service to Basslink Pty. Ltd. NCSPS was designed and implemented to maximise the power transfer capacity on transmission corridor. Due to the evolution of the Tasmanian power system, there is a need to review the network security risks of Temporary Over Voltage (TOV) following certain NCSPS action at Hadspen-George Town 220 kV transmission corridor. Appropriate limit advice and constraint equations are developed and invoked for the secure operation of the power system. This paper describes the system studies and observations used in constructing the TOV limit advice.
Keywords
power system control; power system protection; power system security; limit equation; network control system protection scheme action; network security risks; power transfer capacity; voltage 220 kV; Cities and towns; Educational institutions; Equations; Generators; Mathematical model; Optical wavelength conversion; Voltage control; Basslink; Network Control System Protection Scheme; Tasmanian power system; Temporary Over Voltage; constraint equation; limit advice;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Conference (AUPEC), 2014 Australasian Universities
Conference_Location
Perth, WA
Type
conf
DOI
10.1109/AUPEC.2014.6966553
Filename
6966553
Link To Document