• DocumentCode
    164440
  • Title

    Transformer design review — Important step in the technical risk management of the transformer procurement and design/manufacturing process

  • Author

    Perin, Stjepan

  • Author_Institution
    Transformer Sales, ABB Australia, Pty, Ltd., Moorebank, NSW, Australia
  • fYear
    2014
  • fDate
    Sept. 28 2014-Oct. 1 2014
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Over the past 15 or more years Australian transformer industry went through the significant changes both on the purchasers side and on the side of suppliers. Those changes directly impact management of the technical risk on the side of the purchasers in the process of the procurement and on the side of the suppliers in the process of design and manufacture. This paper is describing those changes, their impact to the technical and commercial risks and suggests how industry if working together throughout the process can better manage those risks. Transformer design review can significantly contribute in the reduction and in control of the technical and commercial risks of the whole process.
  • Keywords
    design for manufacture; power transformers; procurement; purchasing; risk analysis; technical risk management; transformer design; transformer industry; transformer procurement; Australia; Educational institutions; Industries; Power engineering; Power transformers; Production facilities; Testing; Design review; industry; manufacturers; purchasers; technical risk; transformers; utility;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Conference (AUPEC), 2014 Australasian Universities
  • Conference_Location
    Perth, WA
  • Type

    conf

  • DOI
    10.1109/AUPEC.2014.6966614
  • Filename
    6966614