Title :
Notice of Retraction
Research on the cost control and estimation of engineering management
Author_Institution :
Constr. Manage. & Real Estate Sch., Chongqing Univ., Chongqing, China
Abstract :
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
The paper analyzes the basic principle of the engineering management cost control, introduces the content and method of the engineering management cost control from project bidding stage, construction preparation stage, construction stage, completion and acceptance stage, and points out that the engineering management cost control level is the key of the project benefit evaluation, and is the important way of improving engineering management level and decreasing project operation risk.
Keywords :
PERT; construction industry; cost-benefit analysis; life cycle costing; project engineering; risk analysis; construction completion stage; construction preparation stage; cost control; cost estimation; engineering management; project benefit evaluation; project bidding stage; project operation risk reduction; Economics; Estimation; Investments; Cost Control; Cost Estimation; Engineering Management;
Conference_Titel :
Advanced Management Science (ICAMS), 2010 IEEE International Conference on
Conference_Location :
Chengdu
Print_ISBN :
978-1-4244-6931-4
DOI :
10.1109/ICAMS.2010.5553102