Implementing a voltage upgrade in a Mega City
Author :
Surange, Vishwas ; Murugan, P. ; Raina, D.
Author_Institution :
Tata Power Co. Ltd., Mumbai, India
Abstract :
Mumbai Metropolitan City, India is witnessing unprecedented rise in power demand over last decade. Tata Power, the licensee for Generation, Transmission and Distribution of electricity for city of Mumbai, has taken up various projects to augment the power infrastructure of Mumbai City. This paper describes a novel method of upgrading of existing 110 kV double circuit transmission lines with 220 kV multi circuit transmission lines using existing Right of Way, without giving shutdowns to existing consumers during entire construction period. This paper also describes the methods to deal with various socio-economic, political and environmental issues popping up during the project execution.
Keywords :
demand side management; distribution networks; electric power generation; power transmission lines; transmission networks; India; Mega City; Mumbai Metropolitan City; Tata Power; double circuit transmission lines; electricity distribution; electricity generation; electricity transmission; environmental issues; multi circuit transmission lines; political issues; power demand; power infrastructure; socio-economic issues; voltage 110 kV; voltage 220 kV; voltage upgrade; Cities and towns; Companies; Conductors; Poles and towers; Power cables; Power demand; Four Circuit Towers; Replacement of Towers; Right of Way; Transmission Line; Voltage upgrade;
Conference_Titel :
Transmission and Distribution Construction, Operation and Live-Line Maintenance (ESMO), 2011 IEEE PES 12th International Conference on
Conference_Location :
Providence, RI
Print_ISBN :
978-1-4577-0566-3
DOI :
10.1109/TDCLLM.2011.6042234