This paper gives a brief introduction to the problem of repeating or `chattering´ alarms. It describes two different approaches that have been applied by National Power in order to reduce the detrimental effects of repeating alarms on the operators work load. Both approaches are simple to apply and combined with other alarm reduction methods can make a significant improvement to a list based alarm system
Keywords :
power stations; National Power; alarm reduction methods; list based alarm system; operator work load; power stations; repeating alarms;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Stemming the Alarm Flood (Digest No: 1997/136), IEE Colloquium on
Conference_Location :
London
Type :
conf
DOI :
10.1049/ic:19970751
Filename :
663959
Link To Document :
بازگشت