DocumentCode
171944
Title
Further coordination tests between SPDs and between SPD and Equipment
Author
Rousseau, Alain ; Qibin Zhou ; Yang Zhao
Author_Institution
SEFTIM, Vincennes, France
fYear
2014
fDate
11-18 Oct. 2014
Firstpage
540
Lastpage
545
Abstract
There may be SPD from many manufacturers on the same line. One SPD is installed by the contractor in charge of electrical installation and then various panel boards are used in the installation made by various panel builders. All of them may use a different brand of SPDs. A solution would be to perform the coordination tests proposed by the European CLC TS 61643-12 standard. A preliminary paper was presented at ICLP 2012 and this is a further contribution taking care of comments received.
Keywords
electrical installation; power apparatus; surge protection; European CLC TS 61643- 12 standard; ICLP 2012; SPD; coordination testing; electrical installation; panel board; panel builder; surge protective device; Clamps; Surge protection; Surges; Switches; SPDs; coordination; equipment; installation; tests;
fLanguage
English
Publisher
ieee
Conference_Titel
Lightning Protection (ICLP), 2014 International Conference o
Conference_Location
Shanghai
Type
conf
DOI
10.1109/ICLP.2014.6973183
Filename
6973183
Link To Document