DocumentCode :
1725683
Title :
Installation and testing of the signalling system
Author :
Marriott, D
Author_Institution :
Network Rail, UK
fYear :
2010
Firstpage :
175
Lastpage :
187
Abstract :
Testing is a developing science. As technology moves on, the techniques employed will need to change. The basic requirement remains the same. We do not possess the ability to take a system apart, to examine it minutely for a defect that might lead to incidents or reliability problems later. Therefore, a sufficiently robust series of iterative tests is required. Iterative tests that will guarantee that an installation has been designed and installed to a standard that is both safe and fit for purpose.
fLanguage :
English
Publisher :
iet
Conference_Titel :
Railway Signalling and Control Systems (RSCS 2010), IET Professional Development Course on
Conference_Location :
Birmingham, UK
Type :
conf
DOI :
10.1049/ic.2010.0098
Filename :
5556157
Link To Document :
بازگشت