    Earth potential rise influence in high voltage substations with long cable and transmission lines in rural areas

  • Author

    Radosevic, Tomislav ; Musulin, Katarina ; Dikic, Branimir

  • Author_Institution
    RAVEL d.o.o., Zagreb, Croatia
  • fYear
    2014
  • fDate
    13-16 May 2014
  • Firstpage
    550
  • Lastpage
    556
  • Abstract
    Earthing network is one of the most important parts of substation as it protects personnel in SS and customers in LV grid from dangerous step and touch voltages caused by earth potential rise. Earthing is essential for electric supply system to ensure safety and proper operation. Important issue that arises in the design and implementation of earthing system is earth potential rise. Earth potential rise in SS connected long cable and overhead lines is specifically regarded in this paper. Calculation of earthing resistance in the SS 35/20 kV Hrvatska Kostajnica, earth potential rise are calculated and presented. Earthing calculation prior to and after implementation of partial compensation are given and calculation results were compared with measured values.
  • Keywords
    earthing; power cables; power overhead lines; substation protection; Hrvatska Kostajnica; LV grid; dangerous step; earth potential rise influence; earthing network; earthing resistance; electric supply system; high voltage substations; long cable; overhead lines; partial compensation; rural areas; touch voltages; transmission lines; voltage 20 kV; voltage 35 kV; Earth; Grounding; Inductors; Integrated circuits; Power cables; Resistance; Resistors; Earthing network; earth potential rise; neutral earthing reactor;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Energy Conference (ENERGYCON), 2014 IEEE International
  • Conference_Location
    Cavtat
  • Type

    conf

  • DOI
    10.1109/ENERGYCON.2014.6850480
  • Filename
    6850480