DocumentCode
173483
Title
Earth potential rise influence in high voltage substations with long cable and transmission lines in rural areas
Author
Radosevic, Tomislav ; Musulin, Katarina ; Dikic, Branimir
Author_Institution
RAVEL d.o.o., Zagreb, Croatia
fYear
2014
fDate
13-16 May 2014
Firstpage
550
Lastpage
556
Abstract
Earthing network is one of the most important parts of substation as it protects personnel in SS and customers in LV grid from dangerous step and touch voltages caused by earth potential rise. Earthing is essential for electric supply system to ensure safety and proper operation. Important issue that arises in the design and implementation of earthing system is earth potential rise. Earth potential rise in SS connected long cable and overhead lines is specifically regarded in this paper. Calculation of earthing resistance in the SS 35/20 kV Hrvatska Kostajnica, earth potential rise are calculated and presented. Earthing calculation prior to and after implementation of partial compensation are given and calculation results were compared with measured values.
Keywords
earthing; power cables; power overhead lines; substation protection; Hrvatska Kostajnica; LV grid; dangerous step; earth potential rise influence; earthing network; earthing resistance; electric supply system; high voltage substations; long cable; overhead lines; partial compensation; rural areas; touch voltages; transmission lines; voltage 20 kV; voltage 35 kV; Earth; Grounding; Inductors; Integrated circuits; Power cables; Resistance; Resistors; Earthing network; earth potential rise; neutral earthing reactor;
fLanguage
English
Publisher
ieee
Conference_Titel
Energy Conference (ENERGYCON), 2014 IEEE International
Conference_Location
Cavtat
Type
conf
DOI
10.1109/ENERGYCON.2014.6850480
Filename
6850480
Link To Document