• DocumentCode
    1756036
  • Title

    Optimal Multistage PMU Placement for Wide-Area Monitoring

  • Author

    Wen, Miles H. F. ; Jin Xu ; Li, Victor O. K.

  • Author_Institution
    Dept. of Electr. & Electron. Eng., Univ. of Hong Kong, Hong Kong, China
  • Volume
    28
  • Issue
    4
  • fYear
    2013
  • fDate
    Nov. 2013
  • Firstpage
    4134
  • Lastpage
    4143
  • Abstract
    This paper proposes a novel optimization model to maximize the power system observability by placing phasor measurement units (PMUs) in a multistage manner. The problem is constrained by the financial budgets available at each installation stage. The budget may be spent on purchasing and installing new PMUs and relocating PMUs already installed in the power system. This problem is very difficult to solve when the problem size becomes big. Therefore, a newly developed meta-heuristic, called chemical reaction optimization (CRO), is used to solve this optimal multistage PMU placement problem (OMPP), and numerical studies are carried out on the IEEE 57-bus, 118-bus, and 300-bus systems.
  • Keywords
    IEEE standards; optimisation; phasor measurement; CRO; IEEE 118-bus system; IEEE 300-bus system; IEEE 57-bus system; OMPP; chemical reaction optimization; optimal multistage PMU placement problem; phasor measurement unit; power system observability; wide-area monitoring; Chemicals; Monitoring; Observability; Optimization; Phasor measurement units; Power systems; Chemical reaction optimization (CRO); optimal PMU placement; phasor measurement unit (PMU); power system monitoring; smart grid; synchrophasor;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2013.2277741
  • Filename
    6583313