DocumentCode
1770747
Title
Experiences with steady-state PMU compliance testing using standard relay testing equipment
Author
Almas, M.S. ; Kilter, J. ; VANFRETTI, LUIGI
Author_Institution
KTH R. Inst. of Technol., Stockholm, Sweden
fYear
2014
fDate
11-13 June 2014
Firstpage
103
Lastpage
110
Abstract
This paper presents the results of steady state compliance testing of phasor measurement units (PMUs) from three different vendors in a laboratory environment. Testing is performed by providing three phase voltage and current injections to the VT and CT inputs of the PMUs through Freja-300 stand-alone protection relay test set. Testing is performed according to the standard “IEEE C37.242-2013 - IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control”. The paper discusses the test setup, testing process and overall test results of this project. The limitations of stand-alone testing equipment and recommendations for utilizing real-time hardware-in-the-loop simulation for thorough testing of PMUs are also presented.
Keywords
IEEE standards; phasor measurement; power system control; power system protection; relay protection; Freja-300 stand-alone protection relay test set; IEEE C37.242-2013 - IEEE guide; current injections to; phasor measurement units; power system control; power system protection; relay testing equipment; steady state compliance testing; steady-state PMU; voltage injections; Current measurement; Frequency measurement; Harmonic analysis; Phasor measurement units; Steady-state; Testing; Voltage measurement; PMU calibration testing; Phasor Measurement Units; stand-alone testing; synchrophasors;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Power Quality and Supply Reliability Conference (PQ), 2014
Conference_Location
Rakvere
Print_ISBN
978-1-4799-5020-1
Type
conf
DOI
10.1109/PQ.2014.6866793
Filename
6866793
Link To Document