DocumentCode :
1795476
Title :
Capacity assignment of the production lines with consideration of equilibrium requirement in iron & steel complex
Author :
Bo Zhang ; Yang Yang
Author_Institution :
Logistics Inst., Northeastern Univ., Shenyang, China
fYear :
2014
fDate :
11-13 July 2014
Firstpage :
247
Lastpage :
250
Abstract :
This paper concerns the production line capacity assignment problem with consideration of equilibrium requirement, which sources from the practical production management. The problem is to determine the utilized capacity of each production line in the iron & steel complex in order to make the load of each production line equilibrated and keep the logistics between production lines straightway. To tackle this problem, a mathematical programming model is formulated. Then the quadratic objective function is linearized to obtain a linear programming model which can be optimally solved by CPLEX. Finally, the experiment results based on real operational data have been done to illustrate the efficiency of the algorithm.
Keywords :
linear programming; metallurgical industries; production management; quadratic programming; CPLEX; equilibrium requirement; iron and steel complex; linear programming model; logistics; mathematical programming model; production line capacity assignment problem; production management; quadratic objective function; Annealing; Programming; Steel; Iron & steel; equilibrium requirement; linear programming;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
System Science and Engineering (ICSSE), 2014 IEEE International Conference on
Conference_Location :
Shanghai
Type :
conf
DOI :
10.1109/ICSSE.2014.6887943
Filename :
6887943
Link To Document :
بازگشت