DocumentCode :
1815578
Title :
On the use of communication infrastructure in distributed power generation: A preliminary case study
Author :
Marti, Patrizia ; Velasco, Margarita ; Castilla, Miguel ; Miret, Jaume ; Camacho, Antonio
Author_Institution :
Autom. Control Dept., Tech. Univ. of Catalonia, Vilanova i la Geltru, Spain
fYear :
2012
fDate :
17-21 Sept. 2012
Firstpage :
1
Lastpage :
4
Abstract :
Penetration of distributed power generation poses new problems in energy distribution. For example, photovoltaic generation systems may difficult the voltage management in distribution lines and voltage rise may occur. To overcome this problem, several voltage control strategies are available and they can be classified as autonomous or distributed regarding whether communication is available between dispersed generators. Through a preliminary case study, this paper investigates the impact that the communication infrastructure has for a given distributed voltage control strategy. Communication issues like transmission rate, delays, and losses are analyzed with respect to the voltage control application performance.
Keywords :
distributed power generation; power distribution control; power generation control; voltage control; communication infrastructure; distributed power generation; distributed voltage control strategy;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Emerging Technologies & Factory Automation (ETFA), 2012 IEEE 17th Conference on
Conference_Location :
Krakow
ISSN :
1946-0740
Print_ISBN :
978-1-4673-4735-8
Electronic_ISBN :
1946-0740
Type :
conf
DOI :
10.1109/ETFA.2012.6489730
Filename :
6489730
Link To Document :
بازگشت