DocumentCode :
1825227
Title :
Simulation analysis of a multi-item MRP system based on factorial design
Author :
Sun, Li ; Heragu, Sunderesh S. ; Chen, Lijian ; Spearman, Mark L.
Author_Institution :
Ind. Eng. Dept., Univ. of Louisville, Louisville, KY, USA
fYear :
2009
fDate :
13-16 Dec. 2009
Firstpage :
2107
Lastpage :
2114
Abstract :
MRP (Material Requirements Planning) has been widely used as a production scheduling system in many companies for at least the past twenty-five years. However, it is a deterministic planning tool, and therefore its ability as an effective planning tool when there is a high degree of uncertainty is questionable. In this study, we develop a multi-item MRP simulation model and design experiments to determine the effects of factors such as forecast errors, process variability and updating on key performance measures. The analysis of variance (ANOVA) results show that these factors affect the inventory and fill rate significantly.
Keywords :
inventory management; materials requirements planning; scheduling; deterministic planning tool; factorial design; fill rate; forecast errors; inventory; material requirements planning; multi-item MRP system; process variability; production scheduling system; simulation analysis; Analytical models; Costs; Demand forecasting; Frequency; Job shop scheduling; Materials requirements planning; Predictive models; Production; Safety; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference (WSC), Proceedings of the 2009 Winter
Conference_Location :
Austin, TX
Print_ISBN :
978-1-4244-5770-0
Type :
conf
DOI :
10.1109/WSC.2009.5429655
Filename :
5429655
Link To Document :
بازگشت