DocumentCode :
1877723
Title :
Short-term hydrothermal scheduling with reservoir volume constraints. II. Parallel simulated annealing approach
Author :
Wong, Kit Po ; Wong, Yin Wa
Author_Institution :
Dept. of Electr. & Electron. Eng., Western Australia Univ., Nedlands, WA, Australia
fYear :
1993
fDate :
7-10 Dec 1993
Firstpage :
565
Abstract :
For pt.I see ibid., vol.2, p.559-64 (1993). This paper develops a coarse-grained parallel simulated annealing algorithm for short-term hydrothermal scheduling. The design of the algorithm takes into consideration load balancing, processor synchronization reduction, communication overhead reduction and memory contention elimination. The algorithm is implemented on an i860 processor in a simulated environment and is applied to a test system. The scheduling results are presented and are compared to those found by a sequential algorithm
Keywords :
hydroelectric power stations; hydrothermal power systems; power engineering computing; scheduling; simulated annealing; thermal power stations; communication overhead reduction; i860 processor; load balancing; memory contention elimination; parallel simulated annealing; processor synchronization reduction; reservoir volume constraints; sequential algorithm; short-term hydrothermal scheduling;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Advances in Power System Control, Operation and Management, 1993. APSCOM-93., 2nd International Conference on
Conference_Location :
IET
Print_ISBN :
0-85296-569-9
Type :
conf
Filename :
292660
Link To Document :
بازگشت