• DocumentCode
    1896545
  • Title

    Research on Estimation Methods of Internal Rate of Return in Hydraulic Engineering Project

  • Author

    Zhihe Qiao ; Hongyan Zhang

  • Author_Institution
    Northeast Normal Univ., Changchun, China
  • fYear
    2010
  • fDate
    25-26 Dec. 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The internal rate of return method is currently an important analysis tool for economic feasibility evaluation of engineering project. Against the disadvantages of general methods to calculate internal rate of return, such as big calculation amount, slow speed and low result precision, the calculation of internal rate of return in engineering project was equivalently derived into an optimization problem. Then particle swarm optimization algorithm and ant colony optimization algorithm were applied to pursuit the optimal solution. A hydraulic engineering project was taking as an example and the analysis results indicated that the two methods used in the paper were simple, effective and precise, which can be extensively used in engineering projects.
  • Keywords
    PERT; cost-benefit analysis; financial management; hydraulic systems; industrial economics; particle swarm optimisation; project management; ant colony optimization algorithm; economic feasibility evaluation; hydraulic engineering project; internal-rate-of-return method; particle swarm optimization algorithm; Algorithm design and analysis; Ant colony optimization; Estimation; Optimization; Particle swarm optimization; Profitability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Engineering and Computer Science (ICIECS), 2010 2nd International Conference on
  • Conference_Location
    Wuhan
  • ISSN
    2156-7379
  • Print_ISBN
    978-1-4244-7939-9
  • Electronic_ISBN
    2156-7379
  • Type

    conf

  • DOI
    10.1109/ICIECS.2010.5678145
  • Filename
    5678145