DocumentCode :
1896962
Title :
The water industry [automatic meter reading]
Author :
Bond, Alex
fYear :
1994
fDate :
34401
Firstpage :
42522
Lastpage :
42523
Abstract :
Any AMR system must be self financing and should not increase the costs of metering. Systems should be able to develop as metering increases, there will be certain installations where the use of AMR systems will be most cost beneficial. The most appropriate system will need selecting based not just on the immediate needs but how the selected system will allow the reading system to evolve. Standards for the various interfaces will be extremely important to ensure compatibility of equipment and that a change of one part of the system does not reder the whole system redundant. The important point to remember is that the first priority of any AMR system is the reliable transfer of the reading and identity number from the meter to the billing system
fLanguage :
English
Publisher :
iet
Conference_Titel :
Low Power Radio and Metering, IEE Colloquium on
Conference_Location :
London
Type :
conf
Filename :
297366
Link To Document :
بازگشت