Foundation design and construction challenges at river crossing for 345 kV transmission line
Author
Karels, Lucas D.
Author_Institution
Energy Business, Structural Engineer, Stanley Consultants, Inc., Minneapolis, Minnesota USA
fYear
2014
fDate
14-17 April 2014
Firstpage
1
Lastpage
5
Abstract
River crossings are inevitable when designing and constructing foundations for cross-country transmission lines. Factors such as dramatic terrain changes, long spans, heavy loading, and unfavorable soil conditions create significant challenges for engineers and contractors. This paper will present a case history of one particular river crossing on the CapX20201 Brookings County to Hampton 345 kV Transmission Project and how the design team worked with the contractors to overcome several obstacles to construct the foundations.
Keywords
Artesian; Foundation; Geotechnical Engineering; Power Transmission; Structural Engineering;
fLanguage
English
Publisher
ieee
Conference_Titel
T&D Conference and Exposition, 2014 IEEE PES
Conference_Location
Chicago, IL, USA
Type
conf
DOI
10.1109/TDC.2014.6863216
Filename
6863216
Link To Document