    Foundation design and construction challenges at river crossing for 345 kV transmission line

  • Author

    Karels, Lucas D.

  • Author_Institution
    Energy Business, Structural Engineer, Stanley Consultants, Inc., Minneapolis, Minnesota USA
  • fYear
    2014
  • fDate
    14-17 April 2014
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    River crossings are inevitable when designing and constructing foundations for cross-country transmission lines. Factors such as dramatic terrain changes, long spans, heavy loading, and unfavorable soil conditions create significant challenges for engineers and contractors. This paper will present a case history of one particular river crossing on the CapX20201 Brookings County to Hampton 345 kV Transmission Project and how the design team worked with the contractors to overcome several obstacles to construct the foundations.
  • Keywords
    Artesian; Foundation; Geotechnical Engineering; Power Transmission; Structural Engineering;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    T&D Conference and Exposition, 2014 IEEE PES
  • Conference_Location
    Chicago, IL, USA
  • Type

    conf

  • DOI
    10.1109/TDC.2014.6863216
  • Filename
    6863216