• DocumentCode
    1964111
  • Title

    Research for schedule optimization of highway construction project

  • Author

    Hong Lv ; Wen-li Shi ; Long-han Zhang

  • Author_Institution
    Fac. of Mech. & Electr. Eng., Kunming Univ. of Sci. & Technol., Kunming, China
  • Volume
    3
  • fYear
    2012
  • fDate
    20-21 Oct. 2012
  • Firstpage
    453
  • Lastpage
    456
  • Abstract
    Under the condition of market economy, time is money and efficiency is life. Whether a project can be finished in time is one of the most important issues of it and also one of the targets in project management. Calculation for timing plan parameters only makes the initial planning parameters of project, and it did not consider a variety of constraints caused by manpower, resources and cost. Timing plan optimization is the pursuit of integrated supporting and optimization on progress, time and resources arrangement. The thesis takes a certain highway construction project as the research object; formulate the timing plan to make the time optimization, the resource optimization and the cost optimization.
  • Keywords
    industrial economics; optimisation; planning; project management; road building; scheduling; cost constraint; highway construction project; manpower constraint; market economy condition; project management; project planning parameter; resource constraint; schedule optimization; timing plan optimization; timing plan parameter; Time measurement; cost optimization; resource optimization; time optimization; timing plan;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management, Innovation Management and Industrial Engineering (ICIII), 2012 International Conference on
  • Conference_Location
    Sanya
  • Print_ISBN
    978-1-4673-1932-4
  • Type

    conf

  • DOI
    10.1109/ICIII.2012.6340015
  • Filename
    6340015