DocumentCode :
1965152
Title :
200 GeV beam transfer lines at the SSC
Author :
Mariam, Fesseha G. ; McGill, John ; Brown, Karl
Author_Institution :
Superconducting Super Collider Lab., Dallas, TX, USA
fYear :
1993
fDate :
17-20 May 1993
Firstpage :
384
Abstract :
Two beam lines have been designed to transfer 200 GeV protons from the Medium Energy Booster (MEB) to the High Energy Booster (HEB) of the SSC injector complex. At 850 m and 2200 m in length, these are the longest beam transfer lines at the SSC and are intended to inject beam into the bipolar HEB in the clockwise and counter-clockwise directions, respectively. The beam optics is designed so as to facilitate easy tuning and commissioning of these lines. Sources of emittance dilution are identified and estimates of their contribution calculated which serve as basis for specifications of dipole field homogeneity and power supply stability
Keywords :
beam handling equipment; beam handling techniques; ion optics; nuclear electronics; power supplies to apparatus; proton accelerators; storage rings; synchrotrons; tuning; 200 GeV; 2200 m; 850 m; High Energy Booster; Medium Energy Booster; SSC; beam extraction; beam optics; beam transfer lines; bipolar HEB; commissioning; dipole field homogeneity; emittance dilution; injector complex; power supply stability; protons; tuning; Clocks; Optical beams; Optical design; Optical tuning; Particle beam injection; Particle beams; Power supplies; Protons; Stability; Stimulated emission;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
Type :
conf
DOI :
10.1109/PAC.1993.308906
Filename :
308906
Link To Document :
بازگشت