Title :
The AGS-Booster complex for the g-2 experiment and RHIC injection
Author :
Tanaka, Mitsuyoshi ; Lee, Yong Y.
Author_Institution :
Brookhaven Nat. Lab., Upton, NY, USA
Abstract :
The delivery of a beam with characteristics appropriate for the g-2 muon storage ring and the filling of the RHIC heavy ion collider from the AGS main ring requires a new fast extracted beam (NewFEB) system. The NewFEB system must be capable of performing single bunch multiple extraction of a heavy ion beam, as well as a high intensity proton beam at a time interval of 25 ms up to 12 times per AGS cycle. The new system will consist of a fast multipulsing kicker and an ejector septum magnet with local orbit bumps
Keywords :
beam handling equipment; beam handling techniques; ion accelerators; proton accelerators; storage rings; synchrotrons; AGS main ring; AGS-Booster complex; NewFEB system; RHIC heavy ion collider; RHIC injection; ejector septum magnet; fast extracted beam; fast multipulsing kicker; g-2 experiment; g-2 muon storage ring; high intensity proton beam; local orbit bumps; single bunch multiple extraction; Acceleration; Colliding beam devices; Filling; Ion beams; Mesons; Neutrino sources; Particle beams; Protons; Pulse modulation; Structural beams;
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
DOI :
10.1109/PAC.1993.308914