Title :
Model and heuristic algorithm of R&D project scheduling problem with stochastic number of activity iterations
Author :
Gao, Feng ; Chen, Yingwu ; Jiang, Guoping ; Liu, Yanqiong
Author_Institution :
Sch. of Inf. Syst. & Manage., Nat. Univ. of Defense Technol., Changsha, China
Abstract :
Because project scheduling is always under the constraint of resources, the method of coupling activities to cope with activity concurrences and activity iterations in project scheduling faces many difficulties. A process model of R&D projects is presented to satisfy requirements of resource constrained project scheduling. The model integrates uncertain activity durations, uncertain activity outcomes, activity concurrence, and activity iterations into a project scheduling model. Furthermore, A heuristic rule derived from corresponding determinate network is used to resolve the scheduling problem and the algorithm is illustrated with a case.
Keywords :
constraint theory; research and development; resource allocation; scheduling; stochastic processes; R&D project scheduling problem; activity iterations; determinate network; heuristic algorithm; heuristic rule; process model; resource constrained project scheduling; stochastic number; Concurrent engineering; Design optimization; Dynamic scheduling; Heuristic algorithms; Job shop scheduling; Project management; Research and development; Resource management; Scheduling algorithm; Stochastic processes;
Conference_Titel :
Information Reuse and Integration, Conf, 2005. IRI -2005 IEEE International Conference on.
Print_ISBN :
0-7803-9093-8
DOI :
10.1109/IRI-05.2005.1506486