Title :
Performance of the ALS injection system
Author_Institution :
Lawrence Berkeley Lab., California Univ., CA, USA
Abstract :
We started commissioning the Advanced Light Source (ALS) storage ring on January 11, 1993. The stored beam reached 60 mA on March 24, 1993 and 407 mA on April 9, 1993. The fast pace of storage ring commissioning can be attributed partially to the robust injection system. We describe the operating characteristics of the ALS injection system
Keywords :
electron accelerators; linear accelerators; synchrotrons; ALS; Advanced Light Source; injection system; operation; Computer simulation; Electron beams; Filling; Linear particle accelerator; Monitoring; Power system reliability; Shape; Storage rings; Time measurement; Voltage;
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
DOI :
10.1109/PAC.1993.309214